Visual weld inspection services for fabricators and plants
IndustrialImaging matches your weld inspection to certified inspection companies in your region. Visual weld inspection services check every weld for profile, undercut, cracks, porosity, spatter and size against the acceptance table in your code or specification, and they are the first inspection step on almost every weld program. Fabricators, plant owners and general contractors buy them before any other method, because a visual check is the cheapest way to reject a bad weld. Describe the weld program once and the request goes to companies that supply a qualified inspector.
What a visual weld inspection covers
| Stage | What the inspector checks | Typical record |
|---|---|---|
| Before welding | Joint fit up, bevel angle, root gap, cleanliness, material identification, welder and procedure on file | Fit up report or hold point sign off |
| During welding | Preheat, interpass temperature, root pass, cleaning between passes | Daily inspection log |
| After welding | Weld profile and size, undercut, overlap, cracks, porosity, arc strikes, spatter, distortion | Weld map with accept or reject per weld |
| After repair | Excavation, rewelding and the repaired area against the original criteria | Repair record and re-inspection result |
Visual inspection finds what reaches the surface. It does not see internal porosity, lack of fusion or inside cracks. For those, see pipe weld inspection, phased array ultrasonic testing services and radiographic testing.
Acceptance criteria come from your code or specification
The inspection is only as good as the table it is measured against. Structural steel work usually follows AWS D1.1, pipe work follows ASME B31.3 or API 1104 for pipelines, and pressure equipment follows the construction code of the vessel. The visual examination method itself is described in ASME Section V, Article 9, published by ASME. Name the governing document in your request so the inspector brings the right gauges and checks the right limits, for example undercut depth or reinforcement height.
Who buys visual weld inspection services
- Steel fabricators who need a documented inspection on every weld before shipment.
- General contractors and owners who need special inspection of structural welds on a building or bridge project.
- Pipe contractors on process, power and utility piping who hold a hold point after root and final pass.
- Plant maintenance managers who need welds on a repair or shutdown inspected and signed off before restart.
- Quality managers who lost a customer audit on missing weld records and need a qualified inspector on site.
- Equipment makers who must pass a customer source inspection.
Who visual weld inspection services are for
They fit any weld program with a written acceptance criterion and a need for a signed record. They are not enough when the code requires volumetric testing, such as radiography or ultrasonic testing on full penetration pressure welds, and then visual inspection is the first of two steps. For the structural steel scope see structural steel inspection services.
How a visual weld inspection job runs
- You send the weld count, the code or specification, the materials, the location and the schedule.
- The provider assigns an inspector with the credential your specification asks for, such as AWS CWI, and confirms the gauges and the report format.
- The inspector reviews procedures and welder qualifications, then inspects fit up, in process work and finished welds.
- Rejected welds are marked and logged, you repair them, and the inspector re-inspects.
- You receive a weld map or log with accept and reject results per weld and the inspector credentials.
What drives the price of visual weld inspection
- Inspector hours. Most quotes are hourly with a minimum per visit plus travel, and plant work is often a day rate.
- Weld count and weld size. Many small welds take longer than a few large ones.
- Access. Scaffold, height and confined space slow the inspector down.
- Records. Weld maps, photos and procedure review add report time.
- Repairs. Every reinspection after a repair is another line on the quote.
For hourly and day rates see CWI inspection cost, and for a full range across methods see NDT inspection cost.
What to put in your visual weld inspection request for quote
- 01Weld count, joint types and the materials and thicknesses.
- 02Code or specification and the acceptance table that governs.
- 03Inspector credential required, for example CWI, and any customer approval.
- 04Location, shop or field, access, and the inspection schedule.
- 05Hold points, what must be inspected before the next step and who signs.
- 06Report format, weld map and photo requirements.
- 07Whether additional surface or volumetric methods follow the visual check.
How to choose a visual weld inspection company
Ask for the inspector credential and its expiry date, and check that it matches the specification. Ask which code tables the inspector works with every week, and how a rejected weld is recorded and released after repair. Prefer a quote that separates hourly rate, minimum, travel and report so two quotes compare directly.
FAQ
What is included in a visual weld inspection?
A visual weld inspection covers fit up, in process checks and the finished weld, measured against the acceptance table in the governing code. The inspector checks profile, size, undercut, cracks, porosity and spatter, then records accept or reject for every weld.
Is visual inspection enough for welds?
For many structural and low risk welds it is, and it is often the only method the specification requires. For full penetration pressure welds the code usually requires ultrasonic or radiographic testing as well, because visual inspection cannot see internal flaws.
Who can perform a visual weld inspection?
The specification decides. Many projects require an AWS Certified Welding Inspector, others accept an inspector qualified under the employer written practice. State the required credential in the request so every quote prices the right person.
How much do visual weld inspection services cost?
Most quotes are hourly with a per visit minimum plus travel, and plant work is often a day rate. Weld count, access and reporting move the total, and a request through the advisor gets quotes for your own program on one scope.
What is the difference between visual inspection and non destructive testing?
Visual inspection is the oldest non destructive method and checks the surface by eye and with gauges. Other methods such as ultrasonic, radiographic, magnetic particle and penetrant testing add the ability to see inside the weld or find tight surface cracks.
Get matched with visual weld inspection companies
Open the inspection method advisor, enter the weld program, the code and the location, and it builds a complete request for quote for inspection companies in your region. You compare quotes on the same scope instead of describing the job to each company. Browse every method on the NDT companies page, or see the surface crack method in liquid penetrant testing.
- 01What needs inspecting
- ...
- 02Material
- ...
- 04Concern
- ...
Run an inspection company? List your company
Show your weld inspectors and the states you cover, and receive fabrication and plant requests that fit your crews. Learn more for providers.